Planning guide

Compare the work behind the number.

A kitchen or bathroom estimate is easier to assess when the scope, materials and responsibilities line up. Use this worksheet to find the differences before choosing between totals.

ORCA Build Group · October 21, 2026 · Serving the entire Bay Area

01 / Give every estimate the same starting point.

Use the same room photos, dimensions, requested changes and product list. Record the date or revision of each estimate. If your scope changes, ask each company to update its response to the same revision.

02 / Put the differences side by side.

Copy each answer from the written estimate. Mark included, excluded or unknown; add who is responsible and the page or line that supports the answer. Leave an unresolved amount unknown instead of treating it as zero.

CompareEstimate AEstimate BEstimate C
Scope and drawing revisionTo confirmTo confirmTo confirm
Protection, removal and disposalTo confirmTo confirmTo confirm
Surface preparation and repairsTo confirmTo confirmTo confirm
Product models, quantities and finishesTo confirmTo confirmTo confirm
Who buys, receives and checks materialsTo confirmTo confirmTo confirm
Installation and related connectionsTo confirmTo confirmTo confirm
Exclusions and owner-supplied itemsTo confirmTo confirmTo confirm
Allowances or provisional itemsTo confirmTo confirmTo confirm
Approvals and specialist responsibilitiesTo confirmTo confirmTo confirm
Schedule assumptions and dependenciesTo confirmTo confirmTo confirm
Cleanup and completion checklistTo confirmTo confirmTo confirm
How changes and unknown conditions are handledTo confirmTo confirmTo confirm

03 / Turn gaps into written questions.

A product is included, but is installation?

A vanity line may describe the cabinet only. Ask separately about delivery, assembly, fitting, countertop, sink and related connections. Record the actual answer; do not assume those items are included.

A selection is still provisional.

If an estimate uses an allowance or provisional sum, ask exactly what it covers, what quantity or product it assumes and how the final selection changes the total. Compare the same specification before comparing amounts.

The start date depends on something.

Ask which selections, deliveries, access arrangements and approvals must be resolved before dates can be agreed. Record dependencies separately from a confirmed schedule.

“Please confirm whether this item includes supply, installation and disposal, who is responsible for each, and where any exclusion or provisional amount is recorded. Please send the revised scope and total together.”

Compare totals after the differences are documented. Keep unresolved items visible. This guide does not determine project feasibility, required permits, contractor qualifications or a start date.

ORCA Build Group works throughout the entire San Francisco Bay Area. City-specific permit notes above are a starting point for that jurisdiction, not a limit on where we work. Verify current requirements with the city before relying on them.

Turn your notes into a conversation.

Send photos and your priorities. We reply with a price range and the next questions.